Civil Construction

Road Construction

BIA Route NOS 2242-0222 Industrial Drive/Road  - Choctaw, MS
The contract with MBCI was for improvements on approximately 2.9 miles of surface roads in the Pearl River community from Highway 16 to the Tribal Headquarters.  IKBI was the Prime Contractor and the work consisted of mobilization, maintenance of traffice, minor base repair, removing approximately 62,000 Square yards of milling, installing 7,200 tons of hot mix asphalt overlay, and striping the entire 2.9 miles of Industrial Drive.

IDIQ-West North Loop Road-USACE Baltimore District  - Ft. Belvoir, Virginia
IKBI, Inc. was the Prime Contractor for construction of the West North Loop Road, a controlled access 4,400lf, fourlane divided roadway constructed  to VDOT standards with security barriers and a precast concrete arch bridge. Additional constructed features include: traffic signaling, street lighting, underground electrical and communication duct-banks. The roadway scope includes landscaped buffer area and bike trail.

Parking Lot and Site Work

IDIQ –USACE — Vicksburg District - Engineer Research and Development Center 
Jobs under this contract included refurbishments, renovations, historical renovations, construction of parking lots and site work.

Dam Abutments

Sardis Lake—Sardis, MS – USACE — Vicksburg District
This civil construction consisted of the placement of 150,000 tons of rip rap on the abutments of Sardis Dam.
 

This site provides information using PDF, visit this link to download the Adobe Acrobat Reader DC software.